Construction Technique of Submersible Pump Irrigation System

The first optimization of the submersible pump irrigation system is to submerge the submersible pump as a whole. Depth and underground water-saving pipe, the construction sequence and technical points are:

The first is trench excavation. Based on the current situation of the electromechanical well, the diameter of the pump pipe is 1.2m. 0.9 meters deep circular base groove.
The second is to use a tripod to lift the pump and pump tube
The third is to remove the bottom of the base tank to the ground of the cement pipe. And ensure that the well below the base tank is not affected damage.
The fourth is the base groove at the bottom of the compaction and playing a layer of thick 1O cm of plain concrete. To support the pump. The concrete around the well is thickened to 20 cm. Concrete is labeled CIO.
The fifth is to put down the pump and pump tube, remove the pump outlet pipe.
The sixth is to install the first elbow, check valve, short pipe and other equipment, and underground water pipes connected. To ensure that the central axis of the first equipment and underground water pipeline center axis line
The seventh is to confirm the installation is correct test the water. Check for leaks. Inlet valve, check valve is flexible, whether the equipment is running smoothly.
The eighth is to test the water after the successful installation of the well section by section, stamped, the insurance, lock the door, and backfill the base slot, compacted, flat.
Above is the submersible pump irrigation system construction technology all the points, if there are any technical problems please feel free to contact our technical staff.